-
Tripod Turnstile Gate
-
Flap Barrier Gate
-
Swing Barrier Gate
-
Full Height Turnstile
-
Speed Gates
-
Drop Arm Turnstile
-
Half Height Turnstile
-
Access Control Turnstiles
-
Automatic Barrier Gate
-
Car Parking Lock
-
Tyre Killer
-
Automatic Rising Bollards
-
Hydraulic Road Blocker
-
Vehicle Loop Detector
-
Sliding Gate Operator
-
Swing Gate Operator
-
Finn Nielsen in DenmarkYou products have a nice design and competitive price,I like it very much, will give you more orders in the future !
-
Jessica Laux in GermanyIt is my pleasure to do the business with Shenzhen Sinomatic Technology Co. Ltd, they always do the best for us.
Crash Tested Security Drop Down Bollards Programmable Logic Controller PLC IP68 Waterproof
Place of Origin | Shenzhen, China. |
---|---|
Brand Name | SINOMATIC |
Certification | CE/ ISO |
Model Number | SN-HRB01 |
Minimum Order Quantity | Sample order accepted |
Price | negotiable |
Packaging Details | Carton/Plywood box/Pallet |
Delivery Time | 5-7 working days after payment received |
Payment Terms | T/T, Western Union, MoneyGram, credit card/Cash/wechat |
Supply Ability | 1000 pcs a month |

Contact me for free samples and coupons.
Whatsapp:0086 18588475571
Wechat: 0086 18588475571
Skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | SS304 (316 Optional) | Diameter | 168mm, 219mm, 273mm, 324mm |
---|---|---|---|
Height | 600mm, 800mm 1000mm | Thickness | 6mm, 8mm,10mm,12mm, 20mm |
Up Time | 3s To 6s Adjustable | Down Time | 3s To 6s Adjustable |
Min. Loading | 80T | Weight | 150KG± |
High Light | hydraulic rising bollards,automatic retractable bollards |
Programmable Logic Controller(PLC) IP68 rated waterproof crash tested security drop down bollard
Hydraulic automatic bollard usually integrate of oil pump unit and steel frame construction. It use soil pressure as dynamic to realize the rise/fall of bollard.As a moving device, it is usually installed at vehicle entrance/exit. It rises to block the vehicle and falls to the ground level to authorize free passing.
Technical Parameters
Bollard Color | Silver |
Raising/lowering speed | 3-6s(adjustable) |
Diameter | 219mm, 273mm, 324mm |
raised height | 600-1000mm(optional) |
Material | 304 stainless steel |
Control mode | remote control(50m to 100m) |
system control | hydraulic and electric control |
Working temperature | -65℃~75℃ |
Embedded cylinder depth | 1100mm |
Lamp belt | LED lamp (Acrylic light circle) |
Power Supply | 220V/380V |
thickness | 6mm,8mm, 10mm |
weight | 150kg± |
anti-collision levels | K4 to K12 |
service life | 5 million times |
Drainage mode | natural drainage+External drainage system |
Features
1. Anti-collision:It can be used normally after being hit by a 12-ton vehicle.
2. Anti-destructive power:After being hit by a 16-ton vehicle, Hydraulic road bollards deformation.
3. internal structure:With load-bearing steel beam and column, anti-collision steel beam column, 4 navigation rods
4. Can be manually lowered in the event of a power outage
5. Linkage interface
6. Reversible operation according to requirements during ascent and descent
7. Noise during operation of the device≤60 dB
8. Waterproof integrated hydraulic drive
9. Control solenoid valve 24V
10. Control box display text adjustable (up, down, start, time control adjustment)
11. Display text in English
12. Water immersion performance:no leakage during 48 hours and normal lifting
13. Anti-corrosion performance level: 9
Installation steps
1. Cut the ground surface and excavate,the foundation base need around 800mm and 1130mm.
2. Fill the bottom with 20-30mm pebble and sand as water seepage stratum.
3. Embed the bollard,make sure the head of the bottom is at the same level with the horizontal ground.
4. Install the wiring tube and drainage pipe.Make sure each wire should be secured by waterproof tape to avoid water vapor permeated into the wire.
5. Power on to test. Make sure the bollards can work well.Then cover the head of the bollard to avoid the concrete dirty it.All the drainage pipe hole need to be covered by structural adhesive.
6. Pour the concrete into the foundation base.Be careful to avoid the movement of bollard.
7. Tidy up the bollard head and ground surface, complete installation
Drainage method
1. Use artificial drainage or electric pumping mode, need to dig a small pool near the column, regular manual and electric drainage.
2. Use the natural drainage mode to connect directly to the sewer.
A. At the installation junction (two), dig out two square grooves
square grooves: (user-defined)mm (L)* 1000mm(W)* 1330mm(H)
B. Fill the bottom of the groove with 200mm-high concrete, the precision requirement of the horizontal plane is high(Lifting column rack can be subjected to force), and at the middle of the side of the trough, leave a PVC# for drainage.
Case reference
Installation site
Application:
Scientific and educational units: schools, computer rooms, research centers, libraries, etc.;
Leisure and entertainment venues: parks, scenic spots, pedestrian streets, municipal squares, playgrounds, etc..
Traffic: bus station, railway station, subway station, airport, etc..
Business service places: hospitals, banks, hotels, clubs, commercial buildings, etc..
Office space: large office buildings, public inspection units, hydro power and oil and gas units and other government agencies.