Crash Tested Security Drop Down Bollards with Programmable Logic Controller (PLC) IP68 Waterproof
Hydraulic automatic bollards integrate oil pump units with robust steel frame construction, utilizing soil pressure as the driving force to achieve smooth rising and lowering operations. These security bollards are typically installed at vehicle entrances and exits, rising to block unauthorized vehicle access and lowering to ground level to permit authorized passage.
Technical Specifications
| Parameter |
Specification |
| Bollard Color |
Silver |
| Raising/Lowering Speed |
3-6 seconds (adjustable) |
| Diameter |
219mm, 273mm, 324mm |
| Raised Height |
600-1000mm (optional) |
| Material |
304 Stainless Steel |
| Control Mode |
Remote Control (50m to 100m) |
| System Control |
Hydraulic and Electric Control |
| Working Temperature |
-65℃ to 75℃ |
| Embedded Cylinder Depth |
1100mm |
| Lamp System |
LED Lamp with Acrylic Light Circle |
| Power Supply |
220V/380V |
| Thickness |
6mm, 8mm, 10mm |
| Weight |
150kg± |
| Anti-Collision Levels |
K4 to K12 |
| Service Life |
5 Million Cycles |
| Drainage Mode |
Natural Drainage + External Drainage System |
Key Features
High impact resistance - functions normally after collision with 12-ton vehicles
Exceptional durability - withstands impacts from 16-ton vehicles with minimal deformation
Robust internal structure with load-bearing steel beams, anti-collision columns, and 4 navigation rods
Manual lowering capability during power outages
Integrated linkage interface
Reversible operation during ascent and descent cycles
Low noise operation ≤60 dB
Waterproof integrated hydraulic drive system
24V control solenoid valve
Adjustable control box display with English text (up, down, start, time control)
IP68 waterproof rating - no leakage during 48-hour immersion tests with normal lifting function
High anti-corrosion performance level: 9
Installation Procedure
Cut ground surface and excavate foundation base (approximately 800mm x 1130mm)
Fill bottom with 20-30mm pebble and sand layer for water seepage
Embed bollard, ensuring bottom head aligns with ground level
Install wiring and drainage pipes, securing wires with waterproof tape
Power test functionality, then cover bollard head and seal drainage holes with structural adhesive
Pour concrete into foundation base while maintaining bollard position
Finalize bollard head and ground surface finishing
Drainage Options
Option 1: Artificial or electric pumping drainage with collection pool for regular maintenance
Option 2: Natural drainage system connected directly to sewer with custom square grooves and PVC drainage pipes
Product Gallery
Installation Examples
Applications
Scientific & Educational: Schools, computer labs, research centers, libraries
Leisure & Entertainment: Parks, tourist attractions, pedestrian zones, municipal squares
Transportation: Bus stations, railway stations, subway systems, airports
Commercial Services: Hospitals, banks, hotels, commercial buildings
Government & Office: Public facilities, hydro power plants, oil and gas facilities